GME Sheeting & Bracing
Designed to be used for large clear span projects, such as Cast-In-Place projects (bridge footings, pump stations), soil remediation’s, large tank installations and linear applications, the GME Sheeting and Bracing is a cost saving system compared to traditional weld and cuts systems.
Designed and engineered to be used with a variety of sheet piles.
The GME Sheeting and Bracing system is designed and engineered to be used with a variety of sheet piles and can obtain larger clear span widths.
Consisting of enclosed hydraulic rams and static extensions, the rings spacing, which is determined by a Registered Professional Engineer, can be stacked on top of each other during initial installation to help speed up installation time.
The GME Sheeting and Bracing 90 T Strut
Coming in first quarter of 2013, The GME Sheeting and Bracing 90 T Strut. With the addition of the 90 T Strut system, the GME Sheeting and Bracing system will allow users to excavate and shore system in excess of 60’ long!
Later in 2013, The HD Sheeting and Bracing System will allow for longer/bigger clearspans using a larger and stronger extension, which in certain configurations, will eliminate the need for a crossing strut.